AUTOMATION SYSTEM COMPONENTS DETAILS
3
Total No. Of Scheme
3
Total No OHT
3
Covered Village
3
Regular Water Supply Village
1
Connected Device
0
Live Connected Device
0
No. of Scada Auto Μοde
0
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full /Empty)
0
Second Chlorine Tank
(Full /Empty)
| Sno. | Scheme Status | Scheme Id | Scheme Name | District Name | Agency Name | Covered Village | Pump Status | SCADA Auto Mode | Today Water Production () | Overall Production water () | Ground Water Depth(AVG)() | Overall Pump Running Hour | Pump Running Hour() | Solar mode | Pump run solar mode today() | First Chlorine Tank | Second Chlorine Tank | Chlorine() | OHT High Level (Value in %) | OHT Low Level (Value in %) | OHT Level (Value in %) | Pressure | Turbidity() | Voltage RN |
| 1 | Not Integrated | 20066134 | MAHALJANA GP WSS | Muzaffarnagar | NKG-PRIMUS (JV) | 1 | 0.00 | 0.00 | 0.00 | |||||||||||||||
| 2 | Not Integrated | 20047883 | KUSROPUR WSS | Muzaffarnagar | NKG-PRIMUS (JV) | 1 | 0.00 | 0.00 | 0.00 | |||||||||||||||
| 3 | 20071714 | SHAHJUHDI GP WSS | Muzaffarnagar | NKG-PRIMUS (JV) | 1 | Off | Manual | 0.00 | 1528.81 | 171.95 | 0.00 | Off | 0.00 | Full | Full | 1.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |