AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
80
Total No OHT
202
Covered Village
202
Regular Water Supply Village
1
Connected Device
1
Live Connected Device
0
No. of Scada Auto Μοde
1713
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8134904 | Amlikaur GOV and Tubewell Scheme 28 Nos. | 8.79 | 13 | 80 | 202 | 9.86 | 0.28 | 2538788.3 | 0.00 | 27267.00 | 5787.00 | 12561.7 | 4.8 | 24775716.00 | 5630.00 | 38244984.00 | 4764.00 | 6.95 | 0.73 | 1.9 | 670.0 | |