AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
80
Total No OHT
202
Covered Village
202
Regular Water Supply Village
1
Connected Device
1
Live Connected Device
0
No. of Scada Auto Μοde
7890
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8134904 | Amlikaur GOV and Tubewell Scheme 28 Nos. | 25.71 | 13 | 80 | 202 | 0.00 | 0.00 | 2031227.1 | 0.00 | 20147280.00 | 8460.00 | 9881.2 | 6.8 | 21571284.00 | 7680.00 | 34712124.00 | 6806.00 | 7.00 | 2.54 | 1.5 | 806.2 | |