AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
130
Total No OHT
193
Covered Village
191
Regular Water Supply Village
1
Connected Device
1
Live Connected Device
0
No. of Scada Auto Μοde
716
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8135500 | Haraulipur GOV and Tubewell Scheme 125 Nos. | 50.30 | 5 | 12 | 181 | 0.00 | 1.41 | 375193.0 | 0.00 | 1026953.94 | 1103.75 | 6278.0 | 7.0 | 4649.25 | 1903.56 | 18.46 | 0.00 | 6.27 | 0.00 | 8.0 | 76.0 | |