AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
6
Total No OHT
32
Covered Village
32
Regular Water Supply Village
1
Connected Device
1
Live Connected Device
0
No. of Scada Auto Μοde
5
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8135931 | Purwa GOV | 0.61 | 3 | 6 | 32 | 9.20 | 0.00 | 22939.5 | 59.66 | 1881776.00 | 0.00 | 10494.0 | 0.0 | 1881776.00 | 0.00 | 324865.78 | 0.00 | 7.89 | 0.28 | 0.0 | 4480.0 | |