VWSC/ Pani Samiti Member
| Name | Designation | Gender |
|---|---|---|
| Record Not Found | ||
Operation & Maintenance Personnel
| Name | Designation | Gender |
|---|---|---|
| Record Not Found | ||
UTTAR PRADESH
Scheme Basic Information
| State : Uttar Pradesh | District : Azamgarh |
| Block : Tahbarpur | Panchayat : Khalifatpur |
| Village : Khalifatpur | No. of habitations : 12 |
| Covered Population : 2387 | Agency : M/s Sudhakara Infratech Pvt. Ltd |
| Scheme : Khalifatpur water supply | Commissioning Year : 2022-2023 |
Tag Status(Parameters)
| Pump Status: On | Pump Mode: Off |
| Main Valve Mode: On | Bypass Valve Mode: Off |
| Outlet Valve Mode: Off | Solar Mode: On |
| Electric Mode: On | DGC Mode: Off |
| First Chlorine Tank : On | Second Chlorine Tank : On |
| Residual Chlorine: 0.00 | pH: 0.00 |
| Pressure: 1.00 | Turbidity: 8.00 |
| Ground Water: 12.00 | OHT Level: 2.00 |
| Inlet Flow Meter: 11.00 | Outlet Flow Meter: 0.00 |
| Pump Speed Output Freq Hz: 20.00 | RPM: 1181.00 |
| Pump Use Current Amp: 8.00 | Solar Volt DC Bus: 219.00 |
| Electricity Voltage: 173.00 | Use Power KWh: 2.00 |
Today Water Supplied
Average water supply Last 7 Days (LPCD)
Today Pump Running Hour
(HH:mm)
Average Pump Running Hour Last 7 Days (HH:mm)
Daily water supply trend (LPCD)
Residual chlorine (mg/l)
Pump Running Hour
Turbidity(NTU)
VWSC/ Pani Samiti Member
| Name | Designation | Gender |
|---|---|---|
| Record Not Found | ||
Operation & Maintenance Personnel
| Name | Designation | Gender |
|---|---|---|
| Record Not Found | ||